Fifteen years of delivered scope across Iraqi industry.
Each entry listed below represents a finalized contract: identified client, documented tonnage, inspection approval. No renderings, no forecasts.

Named projects, closed contracts.
Crude Storage Tank Erection
Process Piping Installation
Horizontal Tank Fabrication
Steel Structure Assembly
Two vertical API 650 tanks, 3,000 m³ each. Full radiographic weld inspection. Delivered on schedule, Salahuddin, 2017.
Carbon-steel piping runs, ASME B31.3 compliance, 1,200 linear meters installed. HSE close-out confirmed. Baghdad, 2019.
Eight horizontal petrochemical tanks, 120-ton total. ASME Section VIII, UT and RT records filed. Karbala, 2020.
Heavy structural steel erection, 85 tons. AWS D1.1 certified welding crew. Dhi Qar, 2021.
Field Piping and Manifold Works
Oxidized Asphalt Plant Erection
Maintenance Shutdown Works
Industrial Water Tank Installation
Full asphalt oxidization unit installation, mechanical completion within 14-week schedule. Basra, 2023.
Mechanical overhaul during planned outage. Crew of 24 certified welders, zero lost-time incidents. Baghdad, 2023.
Vertical water storage tanks, 5,000 m³ combined capacity. Hydrostatic testing passed first attempt. Anbar, 2024.
Crude gathering manifold, 16-inch headers, 900 m run. Radiographic film archive available. Kirkuk, 2022.


Radiographic film. HSE close-out reports. On record.
Every weld joint on every listed contract carries RT or UT film archived against the project number. Qualified enquiries receive documentation packages within 48 hours.


Same certified welders. Same sites. Zero relearning.
Repeat clients at Baiji, Dora, and Karbala sites deploy the same crew that executed the original contract. Accumulated site knowledge is not a selling point — it is a schedule guarantee.