
Fifteen Years. Certified Welds. Zero Rework.
ASME/AWS-certified execution on tank erection, piping systems, and steel structures across Iraq's refineries and power plants since 2009. Radiographic proof on every joint.


Three Core Disciplines. One Mobilization.
Tank Erection
Vertical and horizontal tanks from 10 to 10,000 m³ — fuel, petrochemical, and industrial water — erected to API 650 and inspected on-site.
Piping Systems
Process and utility piping at refineries and power stations — ASME B31.3 compliance, pressure-tested, no substitutions on schedule.
Steel Structures & Asphalt Plants
Heavy structural steel fabricated and installed on-site, alongside oxidized-asphalt plant erection and mixing-station commissioning.
Credentials That Win Contracts
Est. 2009
ASME / AWS Certified
HSE-First Scheduling
Every weld procedure qualified to ASME Section VIII and AWS D1.1. Radiographic and ultrasonic test records available on request.
International HSE standards enforced on every site. No rescheduling due to safety non-compliance — schedule integrity is contractual.
Iraqi-registered and continuously operating for 15+ years. No gaps in delivery record.
